Marking Lines
Use a level to mark horizontal points at each corner of the wall (column) in the room (if the wall is long, mark several points in the middle as well). Mark a horizontal line (generally 500mm from the ground). Measure from the horizontal line to the designed ceiling height plus 12mm (the thickness of one layer of white steel slab). Mark the horizontal line along the wall (column) with a chalk line; this is the bottom line of the secondary keel for the ceiling.
Simultaneously, according to the ceiling plan, mark the positions of the main keels on the concrete ceiling slab. The main keels should be spaced out from the center of the ceiling outwards, with a maximum spacing of 1000mm. Mark the fixing points of the hangers, with a spacing of 900-1000mm. If the fixing points for beams and pipes exceed the design and specification requirements, additional fixing points should be added.
Fixing Hanging Members
Use expansion bolts to fix the hanging members. For non-accessible suspended ceilings, if the length of the hanger rod is less than 1000mm, a φ6 hanger rod can be used. If it is greater than 1000mm, a φ8 hanger rod should be used, and a reverse support should also be installed. Cold-drawn steel bars and coiled steel bars can be used for the hanger rods, but if coiled steel bars are used, they should be straightened mechanically. For accessible suspended ceilings, if the length of the hanger rod is less than 1000mm, a φ8 hanger rod can be used. If it is greater than 1000mm, a φ10 hanger rod should be used, and a reverse support should also be installed.
One end of the hanger rod is welded to an L30×30×3 angle bracket (the hole diameter of the angle bracket should be determined according to the diameter of the hanger rod and expansion bolts). The other end can be threaded with a tap to create a threaded rod greater than 100mm, or a pre-made threaded rod can be purchased and welded. The finished hanger rod should be rust-proofed. The hanger rod is fixed to the floor slab with expansion bolts, and holes are drilled using an impact hammer.
Suspending Rods on Beams
(1) The suspended rods should be straight and have sufficient load-bearing capacity. When pre-embedded rods need to be extended, they must be lapped and welded securely, and the weld seam must be uniform and full.
(2) The distance between the hanger and the end of the main keel shall not exceed 300mm; otherwise, an additional hanger shall be added.
(3) Additional hangers shall be installed for ceiling lights, air vents, and access panels.